- Home/
- Comparison/
- Mining Excavator/
- Caterpillar 5080 vs. Liebherr R9250
Caterpillar 5080 vs. Liebherr R9250
4 reasons to buy Caterpillar 5080:
Sizes
Clearance | 890 mm and 625 mm | 30 % more or 265 mm |
Carrier
Maximum travel speed | 4.4 km/h and 2.7 km/h | 39 % more or 1.7 km/h |
Excavator specific ground pressure with support 1 | 110.3 kPa and 203.9 kPa | 46 % less or 93.6 kPa |
Bucket loader specific ground pressure | 110.3 kPa and 207.9 kPa | 47 % less or 97.6 kPa |
9 reasons to buy Liebherr R9250:
Sizes
Upper structure clearance | 2205 mm and 1620 mm | 27 % more or 585 mm |
Caterpillar track length | 8240 mm and 7120 mm | 14 % more or 1120 mm |
Operation
Fuel Capacity | 5440 l. and 990 l. | 82 % more or 4450 l. |
Motor
Full power | 960 kW and 319.2 kW | 67 % more or 640.8 kW |
Displacement | 45 l. and 14.6 l. | 68 % more or 30.4 l. |
Loading bucket
Maximum excavation depth | 3800 mm and 2700 mm | 29 % more or 1100 mm |
Maximum digging radius | 13000 mm and 7000 mm | 46 % more or 6000 mm |
Carrier
Unloaded backhoe shovel operational weight with support 1 | 250000 kg and 83800 kg | 66 % more or 166200 kg |
Loading shovel operational weight | 253500 kg and 83800 kg | 67 % more or 169700 kg |
Neutral reasons:
Sizes
Width between caterpillar tracks | 4120 mm and 6100 mm |
Height to cab upper part | 4820 mm and 7250 mm |
Caterpillar track length on ground level | 5840 mm and 6400 mm |
Motor
Model | 3406C ATAAC and QSK45 |
Loading bucket
Maximum cut height | 11000 mm and 12800 mm |
Carrier
Backhoe shovel support width 1 | 750 mm and 850 mm |
Images
Sizes
2. Width between caterpillar tracks | 4120 mm | 2. Width between caterpillar tracks | 6100 mm |
4. Caterpillar track length on ground level | 5840 mm | 4. Caterpillar track length on ground level | 6400 mm |
5. Clearance | 890 mm | 5. Clearance | 625 mm |
7. Height to cab upper part | 4820 mm | 7. Height to cab upper part | 7250 mm |
Loading bucket
17. Maximum cut height | 11000 mm | 17. Maximum cut height | 12800 mm |
19. Maximum digging radius | 7000 mm | 19. Maximum digging radius | 13000 mm |
20. Maximum excavation depth | 2700 mm | 20. Maximum excavation depth | 3800 mm |




