- Home/
- Comparison/
- Mining Excavator/
- Hitachi EX1900 vs. Liebherr R9250
Hitachi EX1900 vs. Liebherr R9250
8 reasons to buy Hitachi EX1900:
Sizes
| Clearance | 795 mm and 625 mm | 21 % more or 170 mm |
Operation
| Rotation speed | 4.7 rev / min and 4.1 rev / min | 13 % more or 0.6 rev |
Loading bucket
| Maximum excavation depth | 5920 mm and 3800 mm | 36 % more or 2120 mm |
| Maximum digging radius | 13430 mm and 13000 mm | 3 % more or 430 mm |
Carrier
| Bucket loader specific ground pressure | 178 kPa and 207.9 kPa | 14 % less or 29.9 kPa |
| Excavator specific ground pressure with support 1 | 178 kPa and 203.9 kPa | 13 % less or 25.9 kPa |
| Maximum travel speed | 2.8 km/h and 2.7 km/h | 4 % more or 0.1 km/h |
| Upper rollers number | 3 and 2 | 33 % more or 1 |
16 reasons to buy Liebherr R9250:
Sizes
| Caterpillar track length | 8240 mm and 7480 mm | 9 % more or 760 mm |
| Upper structure clearance | 2205 mm and 1995 mm | 10 % more or 210 mm |
Shovel boom/sections 1
| Maximum excavation depth | 8700 mm and 8180 mm | 6 % more or 520 mm |
| Maximum unloading height | 10300 mm and 9060 mm | 12 % more or 1240 mm |
| Maximum radius on ground level | 15500 mm and 14770 mm | 5 % more or 730 mm |
Shovel
| Bucket initial volume | 17 m3 and 11 m3 | 35 % more or 6 m3 |
| Maximum bucket volume | 17 m3 and 15 m3 | 12 % more or 2 m3 |
Operation
| Fuel Capacity | 5440 l. and 3085 l. | 43 % more or 2355 l. |
| Hydraulic system fluid volume | 4050 l. and 2200 l. | 46 % more or 1850 l. |
Motor
| Full power | 960 kW and 764.3 kW | 20 % more or 195.7 kW |
| Displacement | 45 l. and 33.9 l. | 25 % more or 11.1 l. |
Loading bucket
| Maximum unloading height | 11000 mm and 10440 mm | 5 % more or 560 mm |
Carrier
| Unloaded backhoe shovel operational weight with support 1 | 250000 kg and 186500 kg | 25 % more or 63500 kg |
| Bucket loader support width | 850 mm and 800 mm | 6 % more or 50 mm |
| Loading shovel operational weight | 253500 kg and 185900 kg | 27 % more or 67600 kg |
| Lower rollers number | 9 and 8 | 11 % more or 1 |
Neutral reasons:
Sizes
| Width between caterpillar tracks | 5400 mm and 6100 mm |
| Height to cab upper part | 6820 mm and 7250 mm |
| Caterpillar track length on ground level | 5780 mm and 6400 mm |
| Rear platform swing radius | 6010 mm and 6140 mm |
Shovel boom/sections 1
| Backhoe shovel boom / section | boom 8300mm with lever 3600mm and 9 m boom / 4 m Section |
| Maximum cut height | 14140 mm and 15200 mm |
Shovel
| Bucket minimum volume | 11 m3 and 11 m3 |
Operation
| Operating voltage | 24 V and 24 V |
Motor
| Aspiration | Turbocharged engine with intermediate cooling of charging air by oncoming air flow and Turbocharging with subsequent air cooling (by a cooling radiator) |
| Model | S12A2-Y1TAA1 and QSK45 |
| Cylinders number | 12 and 12 |
| Power measured at | 1800 rev / min and 1800 rev / min |
| Manufacturer | Hitachi and Cummins |
Loading bucket
| Handle pressure force | 710 Nm and 1210 Nm |
| Maximum cut height | 14610 mm and 12800 mm |
| Loading bucket | standard and 6.37 m boom / 4.2 m Section |
Carrier
| Backhoe shovel support width 1 | 800 mm and 850 mm |
Images
Sizes
| 5. Clearance | 795 mm | 5. Clearance | 625 mm |
| 7. Height to cab upper part | 6820 mm | 7. Height to cab upper part | 7250 mm |
| 8. Rear platform swing radius | 6010 mm | 8. Rear platform swing radius | 6140 mm |
| 2. Width between caterpillar tracks | 5400 mm | 2. Width between caterpillar tracks | 6100 mm |
| 4. Caterpillar track length on ground level | 5780 mm | 4. Caterpillar track length on ground level | 6400 mm |
Loading bucket
| 17. Maximum cut height | 14610 mm | 17. Maximum cut height | 12800 mm |
| 18. Maximum unloading height | 10440 mm | 18. Maximum unloading height | 11000 mm |
| 19. Maximum digging radius | 13430 mm | 19. Maximum digging radius | 13000 mm |
| 20. Maximum excavation depth | 5920 mm | 20. Maximum excavation depth | 3800 mm |
Carrier
| 14. Bucket loader support width | 800 mm | 14. Bucket loader support width | 850 mm |