- Home/
- Comparison/
- Mining Excavator/
- Komatsu PC8000 vs. Hitachi EX1900
Komatsu PC8000 vs. Hitachi EX1900
10 reasons to buy Komatsu PC8000:
Shovel boom/sections 1
| Maximum radius on ground level | 19730 mm and 14770 mm | 25 % more or 4960 mm |
Shovel
| Bucket initial volume | 38 m3 and 11 m3 | 71 % more or 27 m3 |
Operation
| Engine oil volume | 580 l. and 172 l. | 70 % more or 408 l. |
| Hydraulic system fluid volume | 11500 l. and 2200 l. | 81 % more or 9300 l. |
| Fuel Capacity | 14000 l. and 3085 l. | 78 % more or 10915 l. |
| Cooling system fluid volume | 950 l. and 195 l. | 79 % more or 755 l. |
Motor
| Effective power | 3000 kW and 719.6 kW | 76 % more or 2280.4 kW |
| Cylinders number | 16 and 12 | 25 % more or 4 |
Loading bucket
| Maximum digging radius | 16100 mm and 13430 mm | 17 % more or 2670 mm |
Carrier
| Bucket loader support width | 5340 mm and 800 mm | 85 % more or 4540 mm |
4 reasons to buy Hitachi EX1900:
Shovel boom/sections 1
| Maximum excavation depth | 8180 mm and 8090 mm | 1 % more or 90 mm |
Operation
| Rotation speed | 4.7 rev / min and 3.5 rev / min | 26 % more or 1.2 rev |
Carrier
| Maximum travel speed | 2.8 km/h and 2.2 km/h | 21 % more or 0.6 km/h |
| Track shoes number on either side | 49 and 48 | 2 % more or 1 |
Neutral reasons:
Shovel boom/sections 1
| Backhoe shovel boom / section | Boom 37'9" (11500mm) / Section 18' (5500mm) and boom 8300mm with lever 3600mm |
Operation
| Operating voltage | 24 V and 24 V |
Motor
| Manufacturer | Komatsu and Hitachi |
| Model | 2 x SDA16V160 and S12A2-Y1TAA1 |
| Power measured at | 1800 rev / min and 1800 rev / min |
| Aspiration | turbocharging and cooling at the outlet and Turbocharged engine with intermediate cooling of charging air by oncoming air flow |
Loading bucket
| Loading bucket | Boom 29'10" (9100mm) / Section 11'2" (3400mm) and standard |
| Handle pressure force | 2320 Nm and 710 Nm |
Carrier
| Upper rollers number | 3 and 3 |
| Lower rollers number | 8 and 8 |
| Backhoe shovel support width 1 | 4600 mm and 800 mm |
Images
Loading bucket
| 19. Maximum digging radius | 16100 mm | 19. Maximum digging radius | 13430 mm |
Carrier
| 14. Bucket loader support width | 5340 mm | 14. Bucket loader support width | 800 mm |