- Home/
- Comparison/
- Mining Excavator/
- Tata Hitachi EX300 LCH vs. Terex RH340
Tata Hitachi EX300 LCH vs. Terex RH340
7 reasons to buy Tata Hitachi EX300 LCH:
Operation
Rotation speed | 12 rev / min and 3.9 rev / min | 67 % more or 8.1 rev |
Loading bucket
Maximum excavation depth | 3200 mm and 2600 mm | 19 % more or 600 mm |
Carrier
Lower rollers number | 9 and 7 | 22 % more or 2 |
Track shoes number on either side | 50 and 42 | 16 % more or 8 |
Excavator specific ground pressure with support 1 | 66.7 kPa and 213 kPa | 69 % less or 146.3 kPa |
Bucket loader specific ground pressure | 68.7 kPa and 211.7 kPa | 68 % less or 143.0 kPa |
Maximum travel speed | 4 km/h and 2 km/h | 50 % more or 2 km/h |
9 reasons to buy Terex RH340:
Shovel boom/sections 1
Maximum excavation depth | 8900 mm and 6280 mm | 29 % more or 2620 mm |
Operation
Fuel Capacity | 10700 l. and 511 l. | 95 % more or 10189 l. |
Hydraulic system fluid volume | 6100 l. and 330 l. | 95 % more or 5770 l. |
Motor
Full power | 1879.2 kW and 164.1 kW | 91 % more or 1715.1 kW |
Loading bucket
Maximum digging radius | 16300 mm and 7930 mm | 51 % more or 8370 mm |
Maximum unloading height | 11500 mm and 3780 mm | 67 % more or 7720 mm |
Carrier
Unloaded backhoe shovel operational weight with support 1 | 547000 kg and 31500 kg | 94 % more or 515500 kg |
Bucket loader support width | 1400 mm and 500 mm | 64 % more or 900 mm |
Loading shovel operational weight | 552000 kg and 32200 kg | 94 % more or 519800 kg |
Neutral reasons:
Shovel boom/sections 1
Backhoe shovel boom / section | Boom 6400mm/Section 2100mm and boom 34'5" (10500mm) Section 16'5" (5000mm) |
Maximum cut height | 9590 mm and 15900 mm |
Operation
Operating voltage | 24 V and 24 V |
Motor
Manufacturer | Cummins and Cummins |
Model | 6CTA8.3C and 2 x K 1500-E |
Aspiration | turbocharging and turbocharging and cooling at the outlet |
Loading bucket
Loading bucket | Boom 3400mm/Section 3100mm and boom 26'2" (8000mm) Section 16'9" (5100mm) |
Maximum cut height | 7120 mm and 15400 mm |
Carrier
Backhoe shovel support width 1 | 500 mm and 1400 mm |
Upper rollers number | 2 and 2 |
Images
Loading bucket
17. Maximum cut height | 7120 mm | 17. Maximum cut height | 15400 mm |
18. Maximum unloading height | 3780 mm | 18. Maximum unloading height | 11500 mm |
19. Maximum digging radius | 7930 mm | 19. Maximum digging radius | 16300 mm |
20. Maximum excavation depth | 3200 mm | 20. Maximum excavation depth | 2600 mm |
Carrier
14. Bucket loader support width | 500 mm | 14. Bucket loader support width | 1400 mm |