- Home/
- Comparison/
- Wheel-Mounted Loader/
- Kawasaki 70ZV vs. Hitachi LX290E
Kawasaki 70ZV vs. Hitachi LX290E
1 reasons to buy Kawasaki 70ZV:
Shovel
Breakout power | 123.6 kN and 209 kN | 41 % less or 85.4 kN |
7 reasons to buy Hitachi LX290E:
Sizes
Clearance | 510 mm and 405 mm | 21 % more or 105 mm |
Radius at maximum lifting and unloading | 1280 mm and 1090 mm | 15 % more or 190 mm |
Shovel
Unloading ground clearance at maximum lifting | 3065 mm and 2815 mm | 8 % more or 250 mm |
Bucket capacity with top | 4 m3 and 2.7 m3 | 32 % more or 1.3 m3 |
Operation
Static tipping weight | 17800 kg and 12080 kg | 32 % more or 5720 kg |
Fuel Capacity | 342 l. and 285 l. | 17 % more or 57 l. |
Motor
Effective power | 217 kW and 125.3 kW | 42 % more or 91.7 kW |
Neutral reasons:
Sizes
Length with bucket on ground level | 7600 mm and 8350 mm |
Height to cab upper part | 3335 mm and 3450 mm |
Wheelbase | 3050 mm and 3500 mm |
Shovel
Shovel width | 2670 mm and 2980 mm |
Operation
Tyre size | 20.5x25-12PR (L-2) and 26.5R25 |
Working weight | 14330 kg and 21600 kg |
Motor
Manufacturer | Cummins and Isuzu |
Gear box
Transmission type | powershift transmission and ZF fully automatic powershift |
Images
Sizes
3. Height to cab upper part | 3335 mm | 3. Height to cab upper part | 3450 mm |
4. Wheelbase | 3050 mm | 4. Wheelbase | 3500 mm |
5. Clearance | 405 mm | 5. Clearance | 510 mm |
8. Radius at maximum lifting and unloading | 1090 mm | 8. Radius at maximum lifting and unloading | 1280 mm |
1. Length with bucket on ground level | 7600 mm | 1. Length with bucket on ground level | 8350 mm |
Shovel
7. Unloading ground clearance at maximum lifting | 2815 mm | 7. Unloading ground clearance at maximum lifting | 3065 mm |


