- Home/
- Comparison/
- Mining Excavator/
- Hitachi EX2500-6 vs. Caterpillar 5080
Hitachi EX2500-6 vs. Caterpillar 5080
9 reasons to buy Hitachi EX2500-6:
Sizes
| Upper structure clearance | 2140 mm and 1620 mm | 24 % more or 520 mm |
| Caterpillar track length | 7870 mm and 7120 mm | 10 % more or 750 mm |
Operation
| Fuel Capacity | 5000 l. and 990 l. | 80 % more or 4010 l. |
Motor
| Full power | 1044 kW and 319.2 kW | 69 % more or 724.8 kW |
| Displacement | 50 l. and 14.6 l. | 71 % more or 35.4 l. |
Loading bucket
| Maximum excavation depth | 3720 mm and 2700 mm | 27 % more or 1020 mm |
| Maximum digging radius | 14060 mm and 7000 mm | 50 % more or 7060 mm |
Carrier
| Unloaded backhoe shovel operational weight with support 1 | 248000 kg and 83800 kg | 66 % more or 164200 kg |
| Loading shovel operational weight | 249000 kg and 83800 kg | 66 % more or 165200 kg |
4 reasons to buy Caterpillar 5080:
Sizes
| Clearance | 890 mm and 800 mm | 10 % more or 90 mm |
Carrier
| Maximum travel speed | 4.4 km/h and 2.3 km/h | 48 % more or 2.1 km/h |
| Excavator specific ground pressure with support 1 | 110.3 kPa and 181 kPa | 39 % less or 70.7 kPa |
| Bucket loader specific ground pressure | 110.3 kPa and 181 kPa | 39 % less or 70.7 kPa |
Neutral reasons:
Sizes
| Caterpillar track length on ground level | 6120 mm and 5840 mm |
| Width between caterpillar tracks | 6000 mm and 4120 mm |
| Height to cab upper part | 7250 mm and 4820 mm |
Motor
| Model | QSKTA50-CE and 3406C ATAAC |
Loading bucket
| Maximum cut height | 15010 mm and 11000 mm |
Carrier
| Backhoe shovel support width 1 | 1000 mm and 750 mm |
Images
Sizes
| 2. Width between caterpillar tracks | 6000 mm | 2. Width between caterpillar tracks | 4120 mm |
| 4. Caterpillar track length on ground level | 6120 mm | 4. Caterpillar track length on ground level | 5840 mm |
| 5. Clearance | 800 mm | 5. Clearance | 890 mm |
| 7. Height to cab upper part | 7250 mm | 7. Height to cab upper part | 4820 mm |
Loading bucket
| 17. Maximum cut height | 15010 mm | 17. Maximum cut height | 11000 mm |
| 19. Maximum digging radius | 14060 mm | 19. Maximum digging radius | 7000 mm |
| 20. Maximum excavation depth | 3720 mm | 20. Maximum excavation depth | 2700 mm |