- Home/
- Comparison/
- Mining Excavator/
- Tata Hitachi EX3600-5 vs. Caterpillar 385C FS
Tata Hitachi EX3600-5 vs. Caterpillar 385C FS
10 reasons to buy Tata Hitachi EX3600-5:
Sizes
| Caterpillar track length | 8700 mm and 5840 mm | 33 % more or 2860 mm |
| Clearance | 905 mm and 850 mm | 6 % more or 55 mm |
| Upper structure clearance | 2540 mm and 1630 mm | 36 % more or 910 mm |
Operation
| Fuel Capacity | 7200 l. and 1240 l. | 83 % more or 5960 l. |
Motor
| Effective power | 1400 kW and 395.2 kW | 72 % more or 1004.8 kW |
| Displacement | 65.4 l. and 18.1 l. | 72 % more or 47.3 l. |
Loading bucket
| Maximum excavation depth | 3910 mm and 2850 mm | 27 % more or 1060 mm |
| Maximum unloading height | 10990 mm and 7430 mm | 32 % more or 3560 mm |
| Maximum digging radius | 15220 mm and 10350 mm | 32 % more or 4870 mm |
Carrier
| Unloaded backhoe shovel operational weight with support 1 | 350000 kg and 90600 kg | 74 % more or 259400 kg |
2 reasons to buy Caterpillar 385C FS:
Operation
| Rotation speed | 6.2 rev / min and 3.2 rev / min | 48 % more or 3.0 rev |
Carrier
| Maximum travel speed | 4.5 km/h and 2.2 km/h | 51 % more or 2.3 km/h |
Neutral reasons:
Sizes
| Width between caterpillar tracks | 6770 mm and 3400 mm |
| Height to cab upper part | 7750 mm and 4660 mm |
Motor
| Manufacturer | Hitachi and Caterpillar |
| Model | S16R-Y1TAA1 and C18 diesel with ACERT techonlogy |
Loading bucket
| Maximum cut height | 16300 mm and 11260 mm |
Carrier
| Backhoe shovel support width 1 | 1270 mm and 650 mm |
Images
Sizes
| 5. Clearance | 905 mm | 5. Clearance | 850 mm |
| 7. Height to cab upper part | 7750 mm | 7. Height to cab upper part | 4660 mm |
| 2. Width between caterpillar tracks | 6770 mm | 2. Width between caterpillar tracks | 3400 mm |
Loading bucket
| 17. Maximum cut height | 16300 mm | 17. Maximum cut height | 11260 mm |
| 18. Maximum unloading height | 10990 mm | 18. Maximum unloading height | 7430 mm |
| 19. Maximum digging radius | 15220 mm | 19. Maximum digging radius | 10350 mm |
| 20. Maximum excavation depth | 3910 mm | 20. Maximum excavation depth | 2850 mm |