Construction Machinery. Hydraulic Shovel Case CX800
Swing device
Rotation speed | 7.6 rev / min |
Sizes
Width to outside of caterpillar track | 3740 mm |
Height to cab upper part | 3790 mm |
Clearance | 890 mm |
Counterweight ground clearance | 1590 mm |
Rear platform swing radius | 4300 mm |
Caterpillar track length on ground level | 5070 mm |
Shovel
Bucket initial volume | 3.7 m3 |
Bucket minimum volume | 1.9 m3 |
Maximum bucket volume | 4.5 m3 |
Operation
Boom reach drive mechanism fluid volume | 13.5 l. |
Operating voltage | 24 V |
Generator current strength | 50 amperes |
Hydraulic system overflow valve pressure | 31398.7 kPa |
Hydraulic pump flow rate | 1000 l/min |
Working weight | 79474 kg |
Fuel Capacity | 900 l. |
Cooling system fluid volume | 100 l. |
Hydraulic system fluid volume | 720 l. |
Engine oil volume | 47 l. |
Motor
Manufacturer | Isuzu |
Model | 6WG1X |
Effective power | 369 kW |
Power measured at | 1800 rev / min |
Displacement | 15.7 l. |
Torque measured at | 1500 rev / min |
Maximum torque | 2249.3 Nm |
Cylinders number | 6 |
Aspiration | turbocharging |
Carrier
Track shoes number per side | 51 |
Shoe dimensions | 750 mm |
Support rollers number on either side | 3 |
Rolling bearings number on either side | 9 |
Specific ground pressure | 95.1 kPa |
Maximum travel speed | 4.3 km/h |
Hook traction force | 544 kN |
Track width | 3640 mm |
Booms/sections features 4
Unit load-transfer height | 5000 mm |
Unit load-transfer length | 13210 mm |
Maximum excavation depth | 7030 mm |
Maximum radius along ground level | 11990 mm |
Maximum cut height | 11760 mm |
Maximum loading height | 7890 mm |
Maximum vertical wall digging depth | 4250 mm |
Booms/sections features 3
Unit load-transfer height | 4800 mm |
Unit load-transfer length | 14360 mm |
Maximum excavation depth | 8690 mm |
Maximum radius along ground level | 13840 mm |
Maximum cut height | 12910 mm |
Maximum loading height | 8920 mm |
Maximum vertical wall digging depth | 6440 mm |
Booms/sections features 2
Maximum cut height | 13600 mm |
Maximum loading height | 9510 mm |
Maximum vertical wall digging depth | 7750 mm |
Unit load-transfer height | 5000 mm |
Unit load-transfer length | 14320 mm |
Maximum excavation depth | 9470 mm |
Maximum radius along ground level | 14680 mm |
Booms/sections features 1
Unit load-transfer height | 6200 mm |
Unit load-transfer length | 13920 mm |
Maximum excavation depth | 10660 mm |
Maximum radius along ground level | 15860 mm |
Maximum cut height | 14300 mm |
Maximum loading height | 10170 mm |
Maximum vertical wall digging depth | 9110 mm |
Images
Sizes
2. Width to outside of caterpillar track | 3740 mm |
4. Caterpillar track length on ground level | 5070 mm |
5. Clearance | 890 mm |
7. Height to cab upper part | 3790 mm |
8. Rear platform swing radius | 4300 mm |
15. Counterweight ground clearance | 1590 mm |
15. Counterweight ground clearance | 1590 mm |
Carrier
6. Track width | 3640 mm |
14. Shoe dimensions | 750 mm |
Booms/sections features 1
1. Unit load-transfer length | 14360 mm |
3. Unit load-transfer height | 4800 mm |
9. Maximum cut height | 12910 mm |
10. Maximum loading height | 8920 mm |
11. Maximum radius along ground level | 13840 mm |
12. Maximum vertical wall digging depth | 6440 mm |
13. Maximum excavation depth | 8690 mm |
1. Unit load-transfer length | 13210 mm |
3. Unit load-transfer height | 5000 mm |
9. Maximum cut height | 11760 mm |
10. Maximum loading height | 7890 mm |
11. Maximum radius along ground level | 11990 mm |
13. Maximum excavation depth | 7030 mm |
1. Unit load-transfer length | 13920 mm |
3. Unit load-transfer height | 6200 mm |
9. Maximum cut height | 14300 mm |
10. Maximum loading height | 10170 mm |
11. Maximum radius along ground level | 15860 mm |
12. Maximum vertical wall digging depth | 9110 mm |
13. Maximum excavation depth | 10660 mm |
1. Unit load-transfer length | 14320 mm |
3. Unit load-transfer height | 5000 mm |
9. Maximum cut height | 13600 mm |
10. Maximum loading height | 9510 mm |
11. Maximum radius along ground level | 14680 mm |
12. Maximum vertical wall digging depth | 7750 mm |
13. Maximum excavation depth | 9470 mm |