- Home/
- Specifications/
- Hydraulic Shovel/
- New Holland/
- EC350
Construction Machinery. Hydraulic Shovel New Holland EC350
Swing device
| Rotation speed | 9 rev / min |
| Swing torque | 112999.3 Nm |
Sizes
| Width to outside of caterpillar track | 3400 mm |
| Height to cab upper part | 3140 mm |
| Clearance | 490 mm |
| Counterweight ground clearance | 1170 mm |
| Rear platform swing radius | 3300 mm |
| Caterpillar track length on ground level | 4035 mm |
Shovel
| Bucket initial volume | 1.3 m3 |
Operation
| Working weight | 35100 kg |
| Fuel Capacity | 600 l. |
| Cooling system fluid volume | 42 l. |
| Hydraulic system fluid volume | 560 l. |
| Engine oil volume | 23 l. |
| Hydraulic system overflow valve pressure | 31998.5 kPa |
| Hydraulic pump flow rate | 570 l/min |
Motor
| Manufacturer | Cummins |
| Model | 6CTA 8.3 |
| Effective power | 186 kW |
| Displacement | 8.3 l. |
| Aspiration | turbocharging |
| Cylinders number | 6 |
Carrier
| Shoe dimensions | 800 mm |
| Specific ground pressure | 49 kPa |
| Track width | 2340 mm |
Booms/sections features 1
| Unit load-transfer length | 11300 mm |
| Maximum excavation depth | 7400 mm |
| Maximum radius along ground level | 11100 mm |
| Maximum cut height | 10900 mm |
| Maximum loading height | 8000 mm |
| Maximum vertical wall digging depth | 5900 mm |
| Unit load-transfer height | 3450 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 3400 mm |
| 4. Caterpillar track length on ground level | 4035 mm |
| 5. Clearance | 490 mm |
| 7. Height to cab upper part | 3140 mm |
| 8. Rear platform swing radius | 3300 mm |
| 15. Counterweight ground clearance | 1170 mm |
| 15. Counterweight ground clearance | 1170 mm |
Carrier
| 6. Track width | 2340 mm |
| 14. Shoe dimensions | 800 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 11300 mm |
| 3. Unit load-transfer height | 3450 mm |
| 9. Maximum cut height | 10900 mm |
| 10. Maximum loading height | 8000 mm |
| 11. Maximum radius along ground level | 11100 mm |
| 12. Maximum vertical wall digging depth | 5900 mm |
| 13. Maximum excavation depth | 7400 mm |