Construction Machinery. Medium-Sized Excavator Caterpillar 307D

Swing device

Rotation speed 10 rev / min

Sizes

Width to outside of caterpillar track 2290 mm
Height to cab upper part 2630 mm
Clearance 360 mm
Counterweight ground clearance 760 mm
Rear platform swing radius 1750 mm
Caterpillar track length on ground level 2120 mm

Shovel

Bucket initial volume 0.23 m3

Operation

Working weight 7075 kg
Fuel Capacity 135 l.
Cooling system fluid volume 15.7 l.
Hydraulic system fluid volume 94 l.
Engine oil volume 12.5 l.
Operating voltage 24 V
Generator current strength 35 amperes
Hydraulic system overflow valve pressure 31998.5 kPa
Hydraulic pump flow rate 272 l/min

Motor

Manufacturer Mitsubishi
Model 4M40 TL
Full power 43 kW
Effective power 41.5 kW
Displacement 2.8 l.
Aspiration turbocharging

Carrier

Shoe dimensions 450 mm
Maximum travel speed 1.9 km/h
Track width 1840 mm

Booms/sections features 2

Unit load-transfer height 2630 mm
Unit load-transfer length 5730 mm
Maximum excavation depth 4600 mm
Maximum radius along ground level 6670 mm
Maximum cut height 7640 mm
Maximum loading height 5610 mm
Maximum vertical wall digging depth 4170 mm

Booms/sections features 1

Unit load-transfer height 2630 mm
Unit load-transfer length 5700 mm
Maximum excavation depth 4050 mm
Maximum radius along ground level 6150 mm
Maximum cut height 7230 mm
Maximum loading height 5210 mm
Maximum vertical wall digging depth 3640 mm

Images

Sizes

5. Clearance 360 mm
7. Height to cab upper part 2630 mm
8. Rear platform swing radius 1750 mm
15. Counterweight ground clearance 760 mm
15. Counterweight ground clearance 760 mm
2. Width to outside of caterpillar track 2290 mm
4. Caterpillar track length on ground level 2120 mm

Carrier

6. Track width 1840 mm
14. Shoe dimensions 450 mm

Booms/sections features 1

1. Unit load-transfer length 5700 mm
3. Unit load-transfer height 2630 mm
9. Maximum cut height 7230 mm
10. Maximum loading height 5210 mm
11. Maximum radius along ground level 6150 mm
12. Maximum vertical wall digging depth 3640 mm
13. Maximum excavation depth 4050 mm
1. Unit load-transfer length 5730 mm
3. Unit load-transfer height 2630 mm
9. Maximum cut height 7640 mm
10. Maximum loading height 5610 mm
11. Maximum radius along ground level 6670 mm
12. Maximum vertical wall digging depth 4170 mm
13. Maximum excavation depth 4600 mm