Construction Machinery. Medium-Sized Excavator Caterpillar 308D CR

Swing device

Rotation speed 10 rev / min

Sizes

Width to outside of caterpillar track 2320 mm
Height to cab upper part 2590 mm
Clearance 385 mm
Counterweight ground clearance 735 mm
Rear platform swing radius 1290 mm
Caterpillar track length on ground level 2280 mm

Shovel

Bucket initial volume 0.23 m3

Operation

Working weight 7850 kg
Fuel Capacity 125 l.
Cooling system fluid volume 15.7 l.
Hydraulic system fluid volume 94 l.
Engine oil volume 12.5 l.
Operating voltage 24 V
Generator current strength 35 amperes
Hydraulic system overflow valve pressure 31998.5 kPa
Hydraulic pump flow rate 272 l/min

Motor

Manufacturer Mitsubishi
Model 4M40 TL
Full power 43 kW
Effective power 41.5 kW
Displacement 2.8 l.
Aspiration turbocharging

Carrier

Shoe dimensions 450 mm
Maximum travel speed 5 km/h
Track width 1870 mm

Booms/sections features 2

Unit load-transfer length 5830 mm
Maximum excavation depth 4630 mm
Maximum radius along ground level 6710 mm
Maximum cut height 7760 mm
Maximum loading height 5730 mm
Maximum vertical wall digging depth 4160 mm
Unit load-transfer height 2590 mm

Booms/sections features 1

Unit load-transfer height 2590 mm
Unit load-transfer length 5810 mm
Maximum excavation depth 4090 mm
Maximum radius along ground level 6190 mm
Maximum cut height 7340 mm
Maximum loading height 5310 mm
Maximum vertical wall digging depth 3650 mm

Images

Sizes

2. Width to outside of caterpillar track 2320 mm
4. Caterpillar track length on ground level 2280 mm
5. Clearance 385 mm
7. Height to cab upper part 2590 mm
8. Rear platform swing radius 1290 mm
15. Counterweight ground clearance 735 mm
15. Counterweight ground clearance 735 mm

Carrier

6. Track width 1870 mm
14. Shoe dimensions 450 mm

Booms/sections features 1

1. Unit load-transfer length 5810 mm
3. Unit load-transfer height 2590 mm
9. Maximum cut height 7340 mm
10. Maximum loading height 5310 mm
11. Maximum radius along ground level 6190 mm
12. Maximum vertical wall digging depth 3650 mm
13. Maximum excavation depth 4090 mm
1. Unit load-transfer length 5830 mm
3. Unit load-transfer height 2590 mm
9. Maximum cut height 7760 mm
10. Maximum loading height 5730 mm
11. Maximum radius along ground level 6710 mm
12. Maximum vertical wall digging depth 4160 mm
13. Maximum excavation depth 4630 mm