- Home/
- Specifications/
- Mini Digger/
- Pel-Job/
- EB200XT
Construction Machinery. Mini Digger Pel-Job EB200XT
Swing device
| Rotation speed | 10 rev / min |
Sizes
| Width to outside of caterpillar track | 1200 mm |
| Height to cab upper part | 2270 mm |
| Clearance | 250 mm |
| Counterweight ground clearance | 470 mm |
| Rear platform swing radius | 1120 mm |
| Caterpillar track length on ground level | 1240 mm |
Shovel
| Bucket initial volume | 0.06 m3 |
| Bucket minimum volume | 0.03 m3 |
| Maximum bucket volume | 0.08 m3 |
Operation
| Working weight | 1780 kg |
| Fuel Capacity | 21 l. |
| Hydraulic system fluid volume | 23 l. |
| Operating voltage | 12 V |
| Hydraulic system overflow valve pressure | 21000 kPa |
| Hydraulic pump flow rate | 57 l/min |
Motor
| Manufacturer | Mitsubishi |
| Model | L3E |
| Full power | 14.2 kW |
| Effective power | 11.2 kW |
| Power measured at | 2800 rev / min |
| Displacement | 0.95 l. |
| Torque measured at | 1850 rev / min |
| Maximum torque | 54 Nm |
Carrier
| Shoe dimensions | 250 mm |
| Maximum travel speed | 4.7 km/h |
Booms/sections features 1
| Maximum cut height | 3750 mm |
| Maximum loading height | 2670 mm |
| Maximum vertical wall digging depth | 1580 mm |
| Unit load-transfer height | 2270 mm |
| Unit load-transfer length | 3780 mm |
| Maximum excavation depth | 2350 mm |
| Maximum radius along ground level | 4010 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 1200 mm |
| 4. Caterpillar track length on ground level | 1240 mm |
| 5. Clearance | 250 mm |
| 7. Height to cab upper part | 2270 mm |
| 8. Rear platform swing radius | 1120 mm |
| 15. Counterweight ground clearance | 470 mm |
| 15. Counterweight ground clearance | 470 mm |
Carrier
| 14. Shoe dimensions | 250 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 3780 mm |
| 3. Unit load-transfer height | 2270 mm |
| 9. Maximum cut height | 3750 mm |
| 10. Maximum loading height | 2670 mm |
| 11. Maximum radius along ground level | 4010 mm |
| 12. Maximum vertical wall digging depth | 1580 mm |
| 13. Maximum excavation depth | 2350 mm |