Construction Machinery. Mini Digger Pel-Job EB25.4

Swing device

Rotation speed 10.5 rev / min

Sizes

Width to outside of caterpillar track 1420 mm
Height to cab upper part 2365 mm
Clearance 3030 mm
Caterpillar track length on ground level 1278 mm
Counterweight ground clearance 551 mm
Rear platform swing radius 1205 mm

Shovel

Bucket initial volume 0.07 m3
Bucket minimum volume 0.03 m3
Maximum bucket volume 0.12 m3

Operation

Working weight 2635 kg
Fuel Capacity 30 l.
Operating voltage 12 V
Generator current strength 70 amperes
Hydraulic system overflow valve pressure 21000 kPa
Hydraulic pump flow rate 44 l/min

Motor

Full power 20.4 kW
Effective power 16.2 kW
Power measured at 2800 rev / min
Displacement 1.3 l.
Torque measured at 1600 rev / min
Maximum torque 78 Nm
Cylinders number 3
Aspiration natural aspiration
Manufacturer Mitsubishi
Model S3L2

Carrier

Shoe dimensions 300 mm
Specific ground pressure 27.5 kPa
Maximum travel speed 3.8 km/h

Booms/sections features 2

Maximum cut height 4370 mm
Maximum loading height 3188 mm
Maximum vertical wall digging depth 2068 mm
Unit load-transfer height 2365 mm
Unit load-transfer length 3990 mm
Maximum excavation depth 2819 mm
Maximum radius along ground level 4697 mm

Booms/sections features 1

Unit load-transfer height 2365 mm
Unit load-transfer length 4182 mm
Maximum excavation depth 2527 mm
Maximum radius along ground level 4400 mm
Maximum cut height 4195 mm
Maximum loading height 3014 mm
Maximum vertical wall digging depth 1818 mm

Images

Sizes

2. Width to outside of caterpillar track 1420 mm
4. Caterpillar track length on ground level 1278 mm
5. Clearance 3030 mm
7. Height to cab upper part 2365 mm
8. Rear platform swing radius 1205 mm
15. Counterweight ground clearance 551 mm
15. Counterweight ground clearance 551 mm

Carrier

14. Shoe dimensions 300 mm

Booms/sections features 1

9. Maximum cut height 4195 mm
10. Maximum loading height 3014 mm
11. Maximum radius along ground level 4400 mm
12. Maximum vertical wall digging depth 1818 mm
13. Maximum excavation depth 2527 mm
1. Unit load-transfer length 3990 mm
3. Unit load-transfer height 2365 mm
9. Maximum cut height 4370 mm
10. Maximum loading height 3188 mm
11. Maximum radius along ground level 4697 mm
12. Maximum vertical wall digging depth 2068 mm
13. Maximum excavation depth 2819 mm
1. Unit load-transfer length 4182 mm
3. Unit load-transfer height 2365 mm