Construction Machinery. Mini Digger Pel-Job EB300

Swing device

Rotation speed 10 rev / min

Sizes

Width to outside of caterpillar track 1480 mm
Height to cab upper part 2390 mm
Clearance 280 mm
Counterweight ground clearance 570 mm
Rear platform swing radius 1260 mm
Caterpillar track length on ground level 1440 mm

Operation

Hydraulic system overflow valve pressure 23000 kPa
Hydraulic pump flow rate 42.6 l/min
Working weight 2725 kg
Fuel Capacity 49 l.
Cooling system fluid volume 6 l.
Hydraulic system fluid volume 48 l.
Engine oil volume 5.2 l.
Operating voltage 12 V
Generator current strength 50 amperes

Motor

Manufacturer Mitsubishi
Model S3L2
Full power 20.3 kW
Effective power 17.2 kW
Power measured at 2800 rev / min
Displacement 1.3 l.
Torque measured at 1600 rev / min
Maximum torque 77 Nm
Cylinders number 3

Carrier

Support rollers number on either side 1
Rolling bearings number on either side 3
Maximum travel speed 3.5 km/h

Booms/sections features 2

Maximum excavation depth 2820 mm
Maximum radius along ground level 4750 mm
Maximum cut height 4520 mm
Maximum loading height 3320 mm
Maximum vertical wall digging depth 2290 mm

Booms/sections features 1

Maximum excavation depth 2520 mm
Maximum radius along ground level 4460 mm
Maximum cut height 4330 mm
Maximum loading height 3130 mm
Maximum vertical wall digging depth 2000 mm

Images

Sizes

15. Counterweight ground clearance 570 mm
2. Width to outside of caterpillar track 1480 mm
4. Caterpillar track length on ground level 1440 mm
5. Clearance 280 mm
7. Height to cab upper part 2390 mm
8. Rear platform swing radius 1260 mm
15. Counterweight ground clearance 570 mm

Booms/sections features 1

9. Maximum cut height 4330 mm
10. Maximum loading height 3130 mm
11. Maximum radius along ground level 4460 mm
12. Maximum vertical wall digging depth 2000 mm
13. Maximum excavation depth 2520 mm
9. Maximum cut height 4520 mm
10. Maximum loading height 3320 mm
11. Maximum radius along ground level 4750 mm
12. Maximum vertical wall digging depth 2290 mm
13. Maximum excavation depth 2820 mm