Construction Machinery. Mini Digger Pel-Job EB350

Swing device

Rotation speed 10 rev / min

Sizes

Caterpillar track length on ground level 1600 mm
Width to outside of caterpillar track 1620 mm
Height to cab upper part 2460 mm
Clearance 290 mm
Counterweight ground clearance 600 mm
Rear platform swing radius 1360 mm

Shovel

Maximum bucket volume 0.16 m3
Bucket initial volume 0.08 m3
Bucket minimum volume 0.04 m3

Operation

Working weight 3582 kg
Fuel Capacity 66 l.
Cooling system fluid volume 8 l.
Hydraulic system fluid volume 62 l.
Engine oil volume 7.7 l.
Operating voltage 12 V
Generator current strength 50 amperes
Hydraulic system overflow valve pressure 23000 kPa
Hydraulic pump flow rate 90.2 l/min

Motor

Manufacturer Mitsubishi
Model S4L2
Full power 27.6 kW
Effective power 21.8 kW
Power measured at 2800 rev / min
Displacement 1.8 l.
Torque measured at 1600 rev / min
Maximum torque 102 Nm
Cylinders number 4

Carrier

Shoe dimensions 300 mm
Support rollers number on either side 1
Rolling bearings number on either side 4
Specific ground pressure 33.3 kPa
Maximum travel speed 4.3 km/h

Booms/sections features 2

Unit load-transfer height 2460 mm
Unit load-transfer length 4750 mm
Maximum excavation depth 3710 mm
Maximum radius along ground level 5420 mm
Maximum cut height 5020 mm
Maximum loading height 3720 mm
Maximum vertical wall digging depth 2500 mm

Booms/sections features 1

Unit load-transfer height 2460 mm
Unit load-transfer length 4750 mm
Maximum excavation depth 3420 mm
Maximum radius along ground level 5130 mm
Maximum cut height 4840 mm
Maximum loading height 3530 mm
Maximum vertical wall digging depth 2200 mm

Images

Sizes

2. Width to outside of caterpillar track 1620 mm
4. Caterpillar track length on ground level 1600 mm
5. Clearance 290 mm
7. Height to cab upper part 2460 mm
8. Rear platform swing radius 1360 mm
15. Counterweight ground clearance 600 mm
15. Counterweight ground clearance 600 mm

Carrier

14. Shoe dimensions 300 mm

Booms/sections features 1

11. Maximum radius along ground level 5130 mm
12. Maximum vertical wall digging depth 2200 mm
13. Maximum excavation depth 3420 mm
1. Unit load-transfer length 4750 mm
3. Unit load-transfer height 2460 mm
9. Maximum cut height 5020 mm
10. Maximum loading height 3720 mm
11. Maximum radius along ground level 5420 mm
12. Maximum vertical wall digging depth 2500 mm
13. Maximum excavation depth 3710 mm
1. Unit load-transfer length 4750 mm
3. Unit load-transfer height 2460 mm
9. Maximum cut height 4840 mm
10. Maximum loading height 3530 mm