- Home/
- Specifications/
- Wheeled Excavator/
- Terex/
- 2205M
Construction Machinery. Wheeled Excavator Terex 2205M
Swing device
| Rotation speed | 9 rev / min |
| Swing torque | 67600 Nm |
Sizes
| Overall width | 2750 mm |
| Overall width with lowered supports | 4210 mm |
| Height to cab upper part | 3120 mm |
| Wheelbase | 2700 mm |
| Upper structure clearance | 1272 mm |
Shovel
| Bucket initial volume | 1.1 m3 |
| Bucket minimum volume | 0.76 m3 |
| Maximum bucket volume | 1.3 m3 |
Operation
| Working weight | 21100 kg |
| Fuel Capacity | 400 l. |
| Engine oil volume | 14 l. |
| Hydraulic system fluid volume | 220 l. |
| Operating voltage | 24 V |
| Hydraulic system overflow valve pressure | 37997 kPa |
| Type of hydraulic pump | piston pump |
| Hydraulic pump flow rate | 460 l/min |
| Tyre size | 10.00-20 |
Motor
| Manufacturer | Deutz |
| Model | BF6M 2012 C |
| Effective power | 135.7 kW |
| Power measured at | 2000 rev / min |
| Displacement | 6 l. |
| Aspiration | turbocharging |
Gear box
| Maximum travel speed | 20 km/h |
Boom/section options 4
| Option - Boom/Section (MEX) 4 | one-piece boom 19'0" (5790mm) Section 2690mm |
| Maximum excavation depth | 6600 mm |
| Maximum cut height | 9500 mm |
Boom/section options 3
| Option - Boom/Section (MEX) 3 | one-piece boom 19'0" (5790mm) Section 2210mm |
| Maximum excavation depth | 5850 mm |
| Maximum cut height | 9050 mm |
Boom/section options 2
| Option - Boom/Section (MEX) 2 | two-piece boom 13'9" (4190mm) Section 2690mm |
| Maximum excavation depth | 6750 mm |
| Maximum cut height | 11350 mm |
Boom/section options 1
| Option - Boom/Section (MEX) 1 | two-piece boom 13'9" (4190mm) Section 2210mm |
| Maximum excavation depth | 6250 mm |
| Maximum cut height | 10950 mm |
Images
Sizes
| 2. Overall width | 2750 mm |
| 4. Wheelbase | 2700 mm |
| 6. Overall width with lowered supports | 4210 mm |
| 7. Height to cab upper part | 3120 mm |
| 14. Upper structure clearance | 1272 mm |
Boom/section options 1
| 9. Maximum cut height | 9500 mm |
| 13. Maximum excavation depth | 6600 mm |
| 9. Maximum cut height | 10950 mm |
| 13. Maximum excavation depth | 6250 mm |
| 9. Maximum cut height | 11350 mm |
| 13. Maximum excavation depth | 6750 mm |
| 9. Maximum cut height | 9050 mm |
| 13. Maximum excavation depth | 5850 mm |