- Home/
- Specifications/
- Mining Excavator/
- Terex/
- RH340
Construction Machinery. Mining Excavator Terex RH340
Sizes
| Width between caterpillar tracks | 7000 mm |
| Height to cab upper part | 8770 mm |
| Caterpillar track length | 9230 mm |
| Caterpillar track length on ground level | 7090 mm |
| Clearance | 1120 mm |
| Upper structure clearance | 2790 mm |
| Caterpillar track height | 2500 mm |
Shovel boom/sections 1
| Backhoe shovel boom / section | boom 34'5" (10500mm) Section 16'5" (5000mm) |
| Maximum excavation depth | 8900 mm |
| Maximum cut height | 15900 mm |
Shovel
| Bucket initial volume | 28 m3 |
| Bucket minimum volume | 28 m3 |
| Maximum bucket volume | 34 m3 |
Operation
| Generator current strength | 350 amperes |
| Fuel Capacity | 10700 l. |
| Hydraulic system fluid volume | 6100 l. |
| Rotation speed | 3.9 rev / min |
| Operating voltage | 24 V |
Motor
| Manufacturer | Cummins |
| Model | 2 x K 1500-E |
| Full power | 1879.2 kW |
| Effective power | 1879.2 kW |
| Power measured at | 1800 rev / min |
| Displacement | 37.7 l. |
| Aspiration | turbocharging and cooling at the outlet |
| Cylinders number | 24 |
Loading bucket
| Loading bucket | boom 26'2" (8000mm) Section 16'9" (5100mm) |
| Maximum excavation depth | 2600 mm |
| Maximum cut height | 15400 mm |
| Maximum unloading height | 11500 mm |
| Maximum digging radius | 16300 mm |
Carrier
| Maximum travel speed | 2 km/h |
| Upper rollers number | 2 |
| Lower rollers number | 7 |
| Track shoes number on either side | 42 |
| Track width | 5600 mm |
| Backhoe shovel support width 1 | 1400 mm |
| Unloaded backhoe shovel operational weight with support 1 | 547000 kg |
| Excavator specific ground pressure with support 1 | 213 kPa |
| Bucket loader support width | 1400 mm |
| Loading shovel operational weight | 552000 kg |
| Bucket loader specific ground pressure | 211.7 kPa |
Images
Sizes
| 2. Width between caterpillar tracks | 7000 mm |
| 4. Caterpillar track length on ground level | 7090 mm |
| 5. Clearance | 1120 mm |
| 7. Height to cab upper part | 8770 mm |
Loading bucket
| 17. Maximum cut height | 15400 mm |
| 18. Maximum unloading height | 11500 mm |
| 19. Maximum digging radius | 16300 mm |
| 20. Maximum excavation depth | 2600 mm |
Carrier
| 6. Track width | 5600 mm |
| 14. Bucket loader support width | 1400 mm |