vs.

      Caterpillar 211B LC vs. Hitachi ZX120-3

      4 reasons to buy Caterpillar 211B LC:

      Sizes

      Width to outside of caterpillar track 2740 mm and 2490 mm 9 % more or 250 mm

      Operation

      Hydraulic pump flow rate 230 l/min and 234 l/min 2 % less or 4 l/min

      Motor

      Displacement 4.4 l. and 3 l. 32 % more or 1.4 l.

      Booms/sections features 1

      Maximum radius along ground level 7980 mm and 7830 mm 2 % more or 150 mm

      7 reasons to buy Hitachi ZX120-3:

      Sizes

      Clearance 440 mm and 403 mm 8 % more or 37 mm

      Operation

      Hydraulic system overflow valve pressure 35000 kPa and 31991.6 kPa 9 % more or 3008.4 kPa

      Motor

      Full power 93 kW and 78.3 kW 16 % more or 14.7 kW

      Carrier

      Maximum travel speed 5.5 km/h and 4.5 km/h 18 % more or 1.0 km/h

      Booms/sections features 1

      Maximum loading height 5960 mm and 5640 mm 5 % more or 320 mm
      Maximum vertical wall digging depth 4270 mm and 3640 mm 15 % more or 630 mm
      Maximum excavation depth 5570 mm and 4760 mm 15 % more or 810 mm

      Neutral reasons:

      Sizes

      Rear platform swing radius 2142 mm and 2130 mm

      Operation

      Working weight 15750 kg and 12100 kg

      Motor

      Manufacturer Caterpillar and Isuzu
      Model 3114 and AJ-4JJ1X

      Carrier

      Shoe dimensions 600 mm and 500 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 2740 mm 2. Width to outside of caterpillar track 2490 mm
      5. Clearance 403 mm 5. Clearance 440 mm
      8. Rear platform swing radius 2142 mm 8. Rear platform swing radius 2130 mm

      Carrier

      14. Shoe dimensions 600 mm 14. Shoe dimensions 500 mm

      Booms/sections features 1

      10. Maximum loading height 6550 mm 10. Maximum loading height 5960 mm
      11. Maximum radius along ground level 10190 mm 11. Maximum radius along ground level 7830 mm
      12. Maximum vertical wall digging depth 4140 mm 12. Maximum vertical wall digging depth 4270 mm
      13. Maximum excavation depth 7140 mm 13. Maximum excavation depth 5570 mm