- Home/
- Comparison/
- Hydraulic Shovel/
- Caterpillar 235C Wide Gauge Trench Excavator vs. Sumitomo SH160-5
Caterpillar 235C Wide Gauge Trench Excavator vs. Sumitomo SH160-5
8 reasons to buy Caterpillar 235C Wide Gauge Trench Excavator :
Sizes
| Width to outside of caterpillar track | 3770 mm and 2590 mm | 31 % more or 1180 mm |
| Clearance | 530 mm and 440 mm | 17 % more or 90 mm |
Motor
| Full power | 186.4 kW and 89.2 kW | 52 % more or 97.2 kW |
| Displacement | 10.5 l. and 3 l. | 71 % more or 7.5 l. |
Booms/sections features 1
| Maximum radius along ground level | 12000 mm and 9040 mm | 25 % more or 2960 mm |
| Maximum loading height | 6780 mm and 6610 mm | 3 % more or 170 mm |
| Maximum vertical wall digging depth | 5760 mm and 5080 mm | 12 % more or 680 mm |
| Maximum excavation depth | 8050 mm and 6060 mm | 25 % more or 1990 mm |
3 reasons to buy Sumitomo SH160-5:
Operation
| Hydraulic system overflow valve pressure | 37000 kPa and 33094.8 kPa | 11 % more or 3905.2 kPa |
| Hydraulic pump flow rate | 284 l/min and 698 l/min | 59 % less or 414 l/min |
Carrier
| Maximum travel speed | 5.4 km/h and 3.2 km/h | 41 % more or 2.2 km/h |
Neutral reasons:
Sizes
| Rear platform swing radius | 3410 mm and 2450 mm |
Operation
| Working weight | 46190 kg and 16900 kg |
Motor
| Manufacturer | Caterpillar and Isuzu |
| Model | 3306 and A1-4JJ1X |
Carrier
| Shoe dimensions | 760 mm and 600 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 3770 mm | 2. Width to outside of caterpillar track | 2590 mm |
| 5. Clearance | 530 mm | 5. Clearance | 440 mm |
| 8. Rear platform swing radius | 3410 mm | 8. Rear platform swing radius | 2450 mm |
Carrier
| 14. Shoe dimensions | 760 mm | 14. Shoe dimensions | 600 mm |
Booms/sections features 1
| 10. Maximum loading height | 6780 mm | 10. Maximum loading height | 6610 mm |
| 11. Maximum radius along ground level | 12000 mm | 11. Maximum radius along ground level | 9040 mm |
| 12. Maximum vertical wall digging depth | 5760 mm | 12. Maximum vertical wall digging depth | 5080 mm |
| 13. Maximum excavation depth | 8050 mm | 13. Maximum excavation depth | 6060 mm |