- Home/
- Comparison/
- Mini Digger/
- Pel-Job EB300XT vs. Komatsu PC20R-8
Pel-Job EB300XT vs. Komatsu PC20R-8
22 reasons to buy Pel-Job EB300XT:
Swing device
Rotation speed | 10 rev / min and 9 rev / min | 10 % more or 1 rev |
Sizes
Counterweight ground clearance | 570 mm and 545 mm | 4 % more or 25 mm |
Width to outside of caterpillar track | 1480 mm and 1370 mm | 7 % more or 110 mm |
Operation
Engine oil volume | 5.2 l. and 3.6 l. | 31 % more or 1.6 l. |
Generator current strength | 50 amperes and 40 amperes | 20 % more or 10 amperes |
Fuel Capacity | 49 l. and 35 l. | 29 % more or 14 l. |
Hydraulic system overflow valve pressure | 23000 kPa and 21000 kPa | 9 % more or 2000 kPa |
Cooling system fluid volume | 6 l. and 4 l. | 33 % more or 2 l. |
Hydraulic pump flow rate | 42.6 l/min and 59.6 l/min | 29 % less or 17.0 l/min |
Hydraulic system fluid volume | 48 l. and 29 l. | 40 % more or 19 l. |
Motor
Full power | 20.3 kW and 19.9 kW | 2 % more or 0.4 kW |
Power measured at | 2800 rev / min and 2600 rev / min | 7 % more or 200 rev |
Displacement | 1.3 l. and 1.2 l. | 8 % more or 0.1 l. |
Maximum torque | 77 Nm and 72.5 Nm | 6 % more or 4.5 Nm |
Booms/sections features 2
Maximum loading height | 3430 mm and 2945 mm | 14 % more or 485 mm |
Maximum excavation depth | 3040 mm and 2550 mm | 16 % more or 490 mm |
Maximum radius along ground level | 4910 mm and 4510 mm | 8 % more or 400 mm |
Maximum vertical wall digging depth | 2440 mm and 2190 mm | 10 % more or 250 mm |
Booms/sections features 1
Maximum excavation depth | 2740 mm and 2350 mm | 14 % more or 390 mm |
Maximum radius along ground level | 4620 mm and 4250 mm | 8 % more or 370 mm |
Maximum loading height | 3250 mm and 2765 mm | 15 % more or 485 mm |
Maximum vertical wall digging depth | 2150 mm and 1900 mm | 12 % more or 250 mm |
3 reasons to buy Komatsu PC20R-8:
Motor
Effective power | 17.4 kW and 17.2 kW | 1 % more or 0.2 kW |
Carrier
Specific ground pressure | 1.6 lb / sq. inch and 4.7 lb / sq. inch | 66 % less or 3.1 lb |
Maximum travel speed | 4.3 km/h and 3.6 km/h | 16 % more or 0.7 km/h |
Neutral reasons:
Sizes
Rear platform swing radius | 1260 mm and 1240 mm |
Caterpillar track length on ground level | 1440 mm and 1340 mm |
Height to cab upper part | 2390 mm and 2450 mm |
Operation
Operating voltage | 12 V and 12 V |
Working weight | 3151 kg and 2535 kg |
Motor
Manufacturer | Mitsubishi and Komatsu |
Model | S3L2 and 3D78AE-3FA |
Torque measured at | 1600 rev / min and 1600 rev / min |
Cylinders number | 3 and 3 |
Carrier
Shoe dimensions | 300 mm and 250 mm |
Rolling bearings number on either side | 3 and 3 |
Booms/sections features 2
Maximum cut height | 4640 mm and 4205 mm |
Unit load-transfer height | 2390 mm and 2450 mm |
Unit load-transfer length | 4370 mm and 4320 mm |
Booms/sections features 1
Maximum cut height | 4450 mm and 4030 mm |
Unit load-transfer height | 2390 mm and 2450 mm |
Unit load-transfer length | 4370 mm and 4250 mm |
Images
Sizes
15. Counterweight ground clearance | 570 mm | 15. Counterweight ground clearance | 545 mm |
2. Width to outside of caterpillar track | 1480 mm | 2. Width to outside of caterpillar track | 1370 mm |
4. Caterpillar track length on ground level | 1440 mm | 4. Caterpillar track length on ground level | 1340 mm |
7. Height to cab upper part | 2390 mm | 7. Height to cab upper part | 2450 mm |
8. Rear platform swing radius | 1260 mm | 8. Rear platform swing radius | 1240 mm |
Carrier
14. Shoe dimensions | 300 mm | 14. Shoe dimensions | 250 mm |
Booms/sections features 1
1. Unit load-transfer length | 4370 mm | 1. Unit load-transfer length | 4320 mm |
3. Unit load-transfer height | 2390 mm | 3. Unit load-transfer height | 2450 mm |
9. Maximum cut height | 4640 mm | 9. Maximum cut height | 4205 mm |
10. Maximum loading height | 3430 mm | 10. Maximum loading height | 2945 mm |
11. Maximum radius along ground level | 4910 mm | 11. Maximum radius along ground level | 4510 mm |
12. Maximum vertical wall digging depth | 2440 mm | 12. Maximum vertical wall digging depth | 2190 mm |
13. Maximum excavation depth | 3040 mm | 13. Maximum excavation depth | 2550 mm |