vs.

      Hitachi ZX220W-3 vs. John Deere 220DW

      1 reasons to buy Hitachi ZX220W-3:

      Swing device

      Swing torque 59370 Nm and 59369.9 Nm 0 % more or 0.1 Nm

      2 reasons to buy John Deere 220DW:

      Operation

      Hydraulic pump flow rate 378 l/min and 378.5 l/min 0 % less or 0.5 l/min

      Gear box

      Maximum travel speed 37.5 km/h and 27.5 km/h 27 % more or 10.0 km/h

      Neutral reasons:

      Swing device

      Rotation speed 12.2 rev / min and 12.2 rev / min

      Sizes

      Overall width 2470 mm and 2730 mm
      Overall width with lowered supports 3440 mm and 3440 mm
      Height to cab upper part 3170 mm and 3170 mm
      Wheelbase 2750 mm and 2750 mm
      Clearance 330 mm and 330 mm
      Rear platform swing radius 2750 mm and 2750 mm
      Upper structure clearance 1230 mm and 1230 mm

      Operation

      Hydraulic system overflow valve pressure 34301.4 kPa and 34301.4 kPa
      Type of hydraulic pump 2 piston pumps and Variable Displacement Axial-Piston
      Working weight 22629 kg and 22629 kg
      Oscillatory axle angle 7 degrees and 7 degrees
      Fuel Capacity 355 l. and 355 l.
      Cooling system fluid volume 26 l. and 26 l.
      Engine oil volume 23 l. and 23 l.
      Front differential fluid volume 9.6 l. and 9.6 l.
      Rear differential fluid volume 13.1 l. and 13.1 l.
      Hydraulic system fluid volume 340 l. and 340 l.

      Motor

      Power measured at 2000 rev / min and 2000 rev / min
      Manufacturer Isuzu and Isuzu
      Displacement 5.2 l. and 5.2 l.
      Model 4HK1X and 4HK1X, III Level III certified
      Cylinders number 4 and 4
      Effective power 118.6 kW and 118.6 kW
      Aspiration Turbocharging with subsequent air cooling (by a cooling radiator) and Turbocharging with intercooler

      Gear box

      Reverse gears number 2 and 2
      Forward gears number 2 and 2

      Boom/section options 2

      Maximum excavation depth 6080 mm and 6080 mm
      Maximum loading height 7630 mm and 7630 mm
      Maximum radius along ground level 9750 mm and 9750 mm
      Maximum vertical wall digging depth 5250 mm and 5250 mm
      Maximum cut height 10560 mm and 10560 mm
      Option - Boom/Section (MEX) 2 two-piece boom and two-piece boom / Section 9'7" (2910mm)
      Unit load-transfer height 3390 mm and 3390 mm
      Unit load-transfer length 9320 mm and 9320 mm

      Boom/section options 1

      Unit load-transfer height 3170 mm and 2990 mm
      Unit load-transfer length 9700 mm and 9700 mm
      Maximum excavation depth 6290 mm and 6290 mm
      Maximum radius along ground level 9960 mm and 9960 mm
      Maximum cut height 10190 mm and 10190 mm
      Option - Boom/Section (MEX) 1 one-piece boom and one-piece boom 18' 8" (5680mm) / Section 9'7"(2910mm)
      Maximum loading height 7350 mm and 7350 mm
      Maximum vertical wall digging depth 5600 mm and 5600 mm

      Images

      Sizes

      6. Overall width with lowered supports 3440 mm 6. Overall width with lowered supports 3440 mm
      7. Height to cab upper part 3170 mm 7. Height to cab upper part 3170 mm
      8. Rear platform swing radius 2750 mm 8. Rear platform swing radius 2750 mm
      14. Upper structure clearance 1230 mm 14. Upper structure clearance 1230 mm
      2. Overall width 2470 mm 2. Overall width 2730 mm
      4. Wheelbase 2750 mm 4. Wheelbase 2750 mm
      5. Clearance 330 mm 5. Clearance 330 mm

      Boom/section options 1

      13. Maximum excavation depth 6080 mm 13. Maximum excavation depth 6080 mm
      1. Unit load-transfer length 9700 mm 1. Unit load-transfer length 9320 mm
      3. Unit load-transfer height 3170 mm 3. Unit load-transfer height 3390 mm
      9. Maximum cut height 10190 mm 9. Maximum cut height 10560 mm
      10. Maximum loading height 7350 mm 10. Maximum loading height 7630 mm
      11. Maximum radius along ground level 9960 mm 11. Maximum radius along ground level 9750 mm
      12. Maximum vertical wall digging depth 5600 mm 12. Maximum vertical wall digging depth 5250 mm