- Home/
- Comparison/
- Mini Digger/
- Komatsu PC09-1 vs. JCB 8032ZTS
Komatsu PC09-1 vs. JCB 8032ZTS
1 reasons to buy Komatsu PC09-1:
Sizes
| Clearance | 1700 mm and 300 mm | 82 % more or 1400 mm |
9 reasons to buy JCB 8032ZTS:
Swing device
| Rotation speed | 10 rev / min and 8.3 rev / min | 17 % more or 1.7 rev |
Sizes
| Width to outside of caterpillar track | 1650 mm and 800 mm | 52 % more or 850 mm |
Operation
| Fuel Capacity | 39 l. and 11 l. | 72 % more or 28 l. |
| Cooling system fluid volume | 7 l. and 2.1 l. | 70 % more or 4.9 l. |
| Hydraulic system fluid volume | 70 l. and 9 l. | 87 % more or 61 l. |
| Engine oil volume | 4.5 l. and 1.7 l. | 62 % more or 2.8 l. |
Carrier
| Maximum travel speed | 3.5 km/h and 3 km/h | 14 % more or 0.5 km/h |
Booms/sections features 1
| Maximum excavation depth | 2510 mm and 1500 mm | 40 % more or 1010 mm |
| Maximum vertical wall digging depth | 1843 mm and 1170 mm | 37 % more or 673 mm |
Neutral reasons:
Sizes
| Rear platform swing radius | 790 mm and 795 mm |
| Height to cab upper part | 2100 mm and 2464 mm |
Operation
| Working weight | 940 kg and 3367 kg |
Motor
| Manufacturer | Komatsu and Perkins |
| Model | 2D70E and 403-15 |
Images
Sizes
| 7. Height to cab upper part | 2100 mm | 7. Height to cab upper part | 2464 mm |
| 8. Rear platform swing radius | 790 mm | 8. Rear platform swing radius | 795 mm |
| 2. Width to outside of caterpillar track | 800 mm | 2. Width to outside of caterpillar track | 1650 mm |
| 5. Clearance | 1700 mm | 5. Clearance | 300 mm |
Booms/sections features 1
| 12. Maximum vertical wall digging depth | 1170 mm | 12. Maximum vertical wall digging depth | 1973 mm |
| 13. Maximum excavation depth | 1500 mm | 13. Maximum excavation depth | 2646 mm |