- Home/
- Comparison/
- Mini Digger/
- Komatsu PC35MR-2 vs. Pel-Job EB14.4
Komatsu PC35MR-2 vs. Pel-Job EB14.4
7 reasons to buy Komatsu PC35MR-2:
Sizes
Width to outside of caterpillar track | 1740 mm and 1130 mm | 35 % more or 610 mm |
Clearance | 2105 mm and 210 mm | 90 % more or 1895 mm |
Counterweight ground clearance | 4850 mm and 458 mm | 91 % more or 4392 mm |
Carrier
Maximum travel speed | 4.6 km/h and 2 km/h | 57 % more or 2.6 km/h |
Booms/sections features 1
Maximum excavation depth | 3170 mm and 1998 mm | 37 % more or 1172 mm |
Maximum radius along ground level | 5225 mm and 3558 mm | 32 % more or 1667 mm |
Maximum vertical wall digging depth | 2720 mm and 1203 mm | 56 % more or 1517 mm |
2 reasons to buy Pel-Job EB14.4:
Operation
Hydraulic system fluid volume | 39 l. and 33 l. | 15 % more or 6 l. |
Motor
Power measured at | 2200 rev / min and 1.6 rev / min | 100 % more or 2198.4 rev |
Neutral reasons:
Swing device
Rotation speed | 9 rev / min and 9 rev / min |
Sizes
Rear platform swing radius | 950 mm and 1090 mm |
Caterpillar track length on ground level | 4850 mm and 1045 mm |
Height to cab upper part | 2530 mm and 2190 mm |
Operation
Operating voltage | 12 V and 12 V |
Working weight | 3740 kg and 1540 kg |
Motor
Model | 3D88E-5 and L3E |
Images
Sizes
2. Width to outside of caterpillar track | 1740 mm | 2. Width to outside of caterpillar track | 1130 mm |
4. Caterpillar track length on ground level | 4850 mm | 4. Caterpillar track length on ground level | 1045 mm |
5. Clearance | 2105 mm | 5. Clearance | 210 mm |
7. Height to cab upper part | 2530 mm | 7. Height to cab upper part | 2190 mm |
8. Rear platform swing radius | 950 mm | 8. Rear platform swing radius | 1090 mm |
15. Counterweight ground clearance | 4850 mm | 15. Counterweight ground clearance | 458 mm |
Booms/sections features 1
11. Maximum radius along ground level | 5225 mm | 11. Maximum radius along ground level | 3558 mm |
12. Maximum vertical wall digging depth | 2720 mm | 12. Maximum vertical wall digging depth | 1203 mm |
13. Maximum excavation depth | 3170 mm | 13. Maximum excavation depth | 1998 mm |