vs.

      Komatsu PC35MR-2 vs. Pel-Job EB14.4

      7 reasons to buy Komatsu PC35MR-2:

      Sizes

      Width to outside of caterpillar track 1740 mm and 1130 mm 35 % more or 610 mm
      Clearance 2105 mm and 210 mm 90 % more or 1895 mm
      Counterweight ground clearance 4850 mm and 458 mm 91 % more or 4392 mm

      Carrier

      Maximum travel speed 4.6 km/h and 2 km/h 57 % more or 2.6 km/h

      Booms/sections features 1

      Maximum excavation depth 3170 mm and 1998 mm 37 % more or 1172 mm
      Maximum radius along ground level 5225 mm and 3558 mm 32 % more or 1667 mm
      Maximum vertical wall digging depth 2720 mm and 1203 mm 56 % more or 1517 mm

      2 reasons to buy Pel-Job EB14.4:

      Operation

      Hydraulic system fluid volume 39 l. and 33 l. 15 % more or 6 l.

      Motor

      Power measured at 2200 rev / min and 1.6 rev / min 100 % more or 2198.4 rev

      Neutral reasons:

      Swing device

      Rotation speed 9 rev / min and 9 rev / min

      Sizes

      Rear platform swing radius 950 mm and 1090 mm
      Caterpillar track length on ground level 4850 mm and 1045 mm
      Height to cab upper part 2530 mm and 2190 mm

      Operation

      Operating voltage 12 V and 12 V
      Working weight 3740 kg and 1540 kg

      Motor

      Model 3D88E-5 and L3E

      Images

      Sizes

      2. Width to outside of caterpillar track 1740 mm 2. Width to outside of caterpillar track 1130 mm
      4. Caterpillar track length on ground level 4850 mm 4. Caterpillar track length on ground level 1045 mm
      5. Clearance 2105 mm 5. Clearance 210 mm
      7. Height to cab upper part 2530 mm 7. Height to cab upper part 2190 mm
      8. Rear platform swing radius 950 mm 8. Rear platform swing radius 1090 mm
      15. Counterweight ground clearance 4850 mm 15. Counterweight ground clearance 458 mm

      Booms/sections features 1

      11. Maximum radius along ground level 5225 mm 11. Maximum radius along ground level 3558 mm
      12. Maximum vertical wall digging depth 2720 mm 12. Maximum vertical wall digging depth 1203 mm
      13. Maximum excavation depth 3170 mm 13. Maximum excavation depth 1998 mm