- Home/
- Comparison/
- Mini Digger/
- Pel-Job EB200XT vs. Nagano NS08
Pel-Job EB200XT vs. Nagano NS08
8 reasons to buy Pel-Job EB200XT:
Sizes
Width to outside of caterpillar track | 1200 mm and 900 mm | 25 % more or 300 mm |
Motor
Full power | 14.2 kW and 5.5 kW | 61 % more or 8.7 kW |
Power measured at | 2800 rev / min and 2000 rev / min | 29 % more or 800 rev |
Carrier
Maximum travel speed | 4.7 km/h and 2 km/h | 57 % more or 2.7 km/h |
Booms/sections features 1
Maximum excavation depth | 2350 mm and 1550 mm | 34 % more or 800 mm |
Maximum radius along ground level | 4010 mm and 2840 mm | 29 % more or 1170 mm |
Maximum loading height | 2670 mm and 2010 mm | 25 % more or 660 mm |
Maximum vertical wall digging depth | 1580 mm and 1140 mm | 28 % more or 440 mm |
1 reasons to buy Nagano NS08:
Operation
Hydraulic pump flow rate | 20.4 l/min and 57 l/min | 64 % less or 36.6 l/min |
Neutral reasons:
Sizes
Rear platform swing radius | 1120 mm and 930 mm |
Caterpillar track length on ground level | 1240 mm and 970 mm |
Operation
Working weight | 1780 kg and 760 kg |
Motor
Manufacturer | Mitsubishi and Kubota |
Carrier
Shoe dimensions | 250 mm and 180 mm |
Booms/sections features 1
Unit load-transfer height | 2270 mm and 2052 mm |
Unit load-transfer length | 3780 mm and 2913 mm |
Images
Sizes
4. Caterpillar track length on ground level | 1240 mm | 4. Caterpillar track length on ground level | 970 mm |
8. Rear platform swing radius | 1120 mm | 8. Rear platform swing radius | 930 mm |
2. Width to outside of caterpillar track | 1200 mm | 2. Width to outside of caterpillar track | 900 mm |
Carrier
14. Shoe dimensions | 250 mm | 14. Shoe dimensions | 180 mm |
Booms/sections features 1
1. Unit load-transfer length | 3780 mm | 1. Unit load-transfer length | 2913 mm |
3. Unit load-transfer height | 2270 mm | 3. Unit load-transfer height | 2052 mm |
10. Maximum loading height | 2670 mm | 10. Maximum loading height | 2010 mm |
11. Maximum radius along ground level | 4010 mm | 11. Maximum radius along ground level | 2840 mm |
12. Maximum vertical wall digging depth | 1580 mm | 12. Maximum vertical wall digging depth | 1140 mm |
13. Maximum excavation depth | 2350 mm | 13. Maximum excavation depth | 1550 mm |